0+

years of entrepreneur experience

KOHLI

About Company

KOHLI ENGINEERING AND POWER MANAGEMENT PRIVATE LIMITED

Envisioned by Mr. Sumit Kohli, a man with a rich entreprenur experience of 12 years and still counting as entrepreneur, he has worked with fortune 500 company like Honeywell a well renowned name in automation and instrumentation, the last assignment was with Nuerth Metals LLC, Dubai as a Gobal Head HR covering 23 location throughout the globe, the company was dealing in different kind of metal recycling business and trading of the same

Worldwide Manufacture

Quality Productions

Company Fun Facts

CORE COMPETENCY

0

Operation and Maintenance

  • End to End Operations of Power Plants
  • Technical Manpower Supply
  • Annual, Preventive and Shutdown Maintenance Services

0

Value Addition

  • Technical Evaluation
  • Business Consultancy
  • Erection, Cold Commissioning and Hot Commissioning Services

0

Distribution and Supply Chain

  • Strong Logistic Support
  • Power Plant and Consumables
  • Spare Parts and Warranty Addressing of Components
  • Solar Products – Distribution and Projects

0

Achievement

Handled Projects of 5 lac + ton fabrication and erection

Proud Client List

CLICK PLAY BUTTON BELOW TO KNOW MORE

MULTIPLE COMPANIES ARE CONTENT WITH OUR SERVICES FOR POWER PLANTS

  1. Operation & Maintenance of the Power Plant.
  2. Operation & Maintenance of the Boilers including  AMC of the boilers.
  3. Project Management for the quality control during the erection phase.
  4. Consultancy for the power management and setting up a power plant.
  5. Erection facility for all type of Mechanical Projects.(Sugar plant/Steel plant/Cement Plants) 
  6. Manpower Supply- Skilled/ Semi Skilled/ unskilled.

Our Competencies

  1. Have an ability to turn around any deficient power plant into an efficient economy.
  2. Fuel cost optimization by suggesting proper multi fuel ratio mix
  3. Substantial reduction in auxiliary power consumption.
  4. Monitoring the activity at sites and review of project schedule, estimation & costing within budget.
  5. Have an expertise of up keeping of critical machine health for round the year trouble free  operation.
  6. Optimize regular operation and maintenance practices to increase efficiency of power plant in
  7. Term of power cost.
  8. Energy audit and their corrective action.
  9. Shutdown and Retrofit jobs of Boilers.
  10. Equipment performance and health monitoring.
  11. Review of plant /project performance.
  12. Training programs for power plant

KOHLI ENGINEERING

Some Major Milestones and hurdles faced and achieved

Lube oil leakage from the cooler which was arrested in 3 hours by bypassing the lube oil circulation line through a external cooler system and the gasket packing was replaced.
CHP plant breakdown
(Uttam Galva Mettalics Ltd.) Site :40 TPH CFBC Boiler
The loader pulley was broken in the crucial hours, the coal hopper was just 35% filled the took complete CHP shut down by unloading the coal from the conveyor and the pulley was replaced.
WHRB boiler tripped
15 MW WHRB Boiler and power plant
Lube oil circulation pump failed suddenly due to which the thrust bearing worn out the same was arrested in a span of single shift and a standby turbo blower was started without hitting the production at the blast furnace.
Incident at turbo blower -2
(Uttam Galva Mettalics Ltd.) Turbo Blower Station
As blast furnace trip due to electrical fault, the immediately the team came in action and by passed the steam line from WHRB boiler to CFBC boiler to maintain the inertia of the turbine in the meanwhile the load was immediately reduced to maintain the equilibrium.
Experienced in 5 lac ton + fabrication and erection